By 2027, we must switch from our present SAP system to the new and improved SAP S/4 HANA system. From this date, older systems will no longer be supported by SAP. Although 2027 is still a few years away, the effort involved in the migration is enormous. TU Braunschweig is carrying out the changeover as a cooperation project with 19 other universities in Lower Saxony. The project is being coordinated across all universities by our Lower Saxony University Competence Center for SAP (CCC).
Various internal TU administrative departments are involved in the project.
Project Owner | Dietmar Symrek (Vice President for Human Resources, Finance and Infrastructure) |
---|---|
Project Manager | Dr. Lotte Gabriel-Jürgens - h.gabriel-juergens(a)tu-braunschweig.de [PMO], Bärbel Hannak b.hanna(@)tu-braunschweig.de [GITZ] |
Project Coordination | Anne Heyroth - a.heyroth(a)tu-braunschweig.de |
Subproject Management Finances | Florian Kirchhoff [GB2], Peter Kasties [Abt.23] |
Subproject Management Controlling | Anja Kübler, Karen Hoffmann [HSC] |
Subproject Management HR | Björn Bork, Anne Fritz [Abt.12] |
Subproject Management Travel Management | Axel Patzwaldt, Anne Fritz [Abt.12] |
Project Duration | 01/2025-12/2027 |
Core Project Team | PMO, Abt. 23, Abt.12, HSC, CCC Hannover |